Hunter Industries Soil-Clik SC PROBE Owners Manual Page: 8

8
Installation
To locate the probe in the future, install a small
valve box near the probe location, and run the
cable through the enclosure.
Installing the Probe (continued)
3. Pack native soil tightly around the probe. Soil must
be in full contact with the probe.
4. Allow the probe to acclimate to the site for two to
three days. Water normally before proceeding to
sensor-based irrigation.